Jones Electric logoJones Electric 07366 671821
Depot energy for electric trucks

Charge electric HGVs on the supply you already have

We design and install DC truck charging, battery storage and rooftop solar for haulage depots, warehouses and fleets, as one joined-up system. One electrical contractor from survey to switch-on.

Grant openDepot Charging Scheme: up to 60% funded, closes 26 Feb 2027
A commercial battery storage cabinet beside a solar array
Hybrid battery storage cabinet · 100 kW / 215 kWh

A typical depot scheme

Solar and night-rate power fill the batteries, the batteries top up the supply when trucks plug in

Grid supply 69 kVA Roof solar 110 kWp Battery storage 2 × 215 kWh Main panel with smart controls 160 kW truck charger 2 bays
What we install

Three systems, designed to work together

Most depots can't run a high-power truck charger on their existing supply, and a supply upgrade can take years. Batteries and solar close the gap, and we design all three as one installation.

A busy haulage depot yard with lorries and a forkliftJones Electric engineers surveying a depot building
01 · HGV and eTruck charging

DC charging for electric trucks and vans

High-power DC chargers for overnight depot charging and quick top-ups between shifts. We handle the whole installation: radar survey, trenching and ducting, concrete bases, feeder pillars, impact protection, cabling, commissioning and connection to your back-office software.

  • PowerSingle and dual-output DC chargers, 120 kW to 400 kW
  • CivilsBases, ducts, Armco barriers, bay layout and lining
  • LiftingOur own lorry-mounted crane, with lift plans
  • SoftwareOCPP set-up and dynamic load management
A commercial battery storage cabinet outside an industrial building at night
Jones Electric – We store sunshine 02 · Battery storage (BESS)

Commercial batteries that work around your supply limit

Battery storage charges from cheap night-rate power and your solar panels, then tops up your supply when the trucks plug in. It keeps you inside your agreed capacity, cuts peak demand charges and can save you a costly supply upgrade.

  • SystemsHybrid and AC-coupled battery cabinets, 100 kW per unit, 215–232 kWh each
  • ScaleUnits combine for larger sites, on purpose-made steel stands
  • Grid rulesG99 applications and G100 export limitation schemes
  • ControlEnergy-management settings tuned to your shift patterns
A clad warehouse building at a depot, suitable for rooftop solarExisting site switchgear inspected during a survey
03 · Solar PV

Rooftop solar on warehouses and depots

Large roofs make free power. We design roof-mounted systems around your roof lights, crown-fixed to trapezoidal sheeting, and connect them straight into hybrid batteries so the energy you make in the day charges your trucks at night.

  • SizeCommercial systems from 30 kWp to 250 kWp and beyond
  • RoofsMetal sheeting, roof lights left clear, structural checks
  • ConnectionDC-coupled into hybrid BESS, or AC string inverters
  • StandardsInstalled and certified to BS 7671 and ENA G99
Commercial solar PV

Solar designed from the roof up

We've worked in solar for 15 years and designed hundreds of commercial systems on metal sheet, flat, fibre cement, slate and tiled roofs. Every system is drawn to scale, modelled for your roof and usage, and installed by our own engineers.

Preliminary scale layout of 219 solar panels on a twin-pitch warehouse roof, with compass, roof pitch, module data and system size
Example preliminary layout: 219 × 460 W panels (100.74 kWp) on a twin-pitch metal warehouse roof, kept back from the roof edges and clear of roof lights and vents. Drawn in CAD, with generation modelled in PVSOL and PVGIS.

How a solar project runs

  1. Desktop feasibility. We look at your roof, your bills and half-hourly data, then size the system and work out the returns.
  2. Surveys. A technical survey of access, cable routes and inverter or battery positions, plus an independent structural survey of the roof.
  3. Grid connection. With your letter of authority we make the G99 / G100 application to your DNO and deal with any witness testing.
  4. Installation. Scaffold and edge protection, the mounting system, panels, cabling, and inverters or a hybrid battery, under CDM.
  5. Commissioning and monitoring. Tested and certified to BS 7671, with online monitoring of generation by day, month and year. The first year of monitoring is free.

What the example roof delivers

System size100.74 kWp
Panels219 × 460 W mono
Expected generationabout 88,650 kWh a year
Carbon savedabout 17 tonnes CO₂ a year
Paybackabout 3 years

From a recent desktop proposal for a site using 240,000 kWh a year at 25p/kWh, with payback after capital allowances. Your figures depend on your roof, usage and tariff.

Planning

Most commercial roof systems count as permitted development when the panels sit at least 1 m from the roof edge and stand no more than 200 mm proud of the roof. We design to those limits and check them for each site.

Tax relief

Solar usually qualifies for the Annual Investment Allowance, so a business can take the full cost off its taxable profits, up to £1 million a year. Your accountant will confirm it for your company.

Approvals

MCS accredited (NAP/68200/23/1), RECC approved (00074126), NICEIC Approved Contractor and SMAS Worksafe. Systems over 50 kWp are installed and certified to BS 7671 and ENA G99.

Why add a battery

A 160 kW charger on a 69 kVA supply

This is a real example from a depot we've designed for. The site has a 100 A three-phase supply, shared with the warehouse forklift chargers. On its own it can't come close to running a 160 kW truck charger.

Two battery units holding 430 kWh between them make up the difference. They recharge overnight and from the roof, and the energy-management system keeps the grid import inside the supply limit.

Bars to one scale (0–269). Supply shown at its kVA rating; battery output 2 × 100 kW. Actual figures depend on your supply, shift pattern and the equipment chosen. We work them out at survey.

Battery storage

What else a battery does for your site

A battery isn't only there to run a charger on a small supply. Once it's on site, the same equipment and controls can cut your electricity costs every day.

  • Load shifting

    Charge the battery overnight on cheaper off-peak rates, or from your solar, and use that energy during the day when power costs most.

  • Peak shaving

    The battery covers short bursts of high demand, so your grid import stays under your agreed supply capacity. That avoids excess capacity charges and can put off an expensive supply upgrade.

  • Avoiding peak-time charges

    Distribution charges are highest in the late-afternoon "red band" on weekdays. Running from the battery at those times cuts the most expensive units on your bill.

  • Power factor correction

    Many commercial battery inverters can supply reactive power. That can improve a poor site power factor and reduce the reactive power (kVArh) charges on half-hourly metered supplies.

  • More value from solar

    Store the solar you'd otherwise export for a few pence, and use it yourself in the evening or on the next shift instead of buying it back at full price.

  • Backup and resilience

    With the right switchgear, a battery can keep essential loads such as IT, lighting, gates or a charger running through a power cut.

  • Grid flexibility income

    Larger systems can earn extra income by helping the network at busy times, through flexibility services run by the DNO and National Energy System Operator, where they're available.

  • A smaller grid connection

    For new sites, a battery can mean asking the DNO for a smaller connection. That's often cheaper and quicker to get than a big new supply.

Which of these pay off depends on your tariff, meter type, load profile and the battery chosen. We model them from your half-hourly data at survey, so you see the savings before you commit.

Savings calculator

What could a battery save your site?

Put in a few figures from your electricity bill for a rough idea of the savings and payback. We'll do the full sums from your half-hourly data at survey.

Estimated saving per year–
Simple payback–
Payback after tax relief (full expensing)–
Net return over 10 years–
  • Load shifting–
  • Peak shaving–
  • Storing solar–
Get a proper assessment

Indicative only. Assumes 90% usable capacity, 90% round-trip efficiency, about 250 full cycles a year, £500 a year maintenance per unit, 2% capacity loss a year and 25% corporation tax. Actual savings depend on your tariff, meter, load profile and equipment. Electricity prices for reference: UK small businesses paid an average of 28.04p per kWh in Q1 2026 (UK Government data).

Government funding

The Depot Charging Scheme pays up to 60% of your depot charging

The government's Depot Charging Scheme part-funds charging at fleet depots for electric HGVs, vans and coaches. It is part of a £170 million programme running to 2030. The current window is open now, and grant rates are expected to fall in later windows.

60%of chargepoint and civil works costs
£1mmaximum per organisation, across all your sites
£38mavailable in this window, first come first served

Who can apply

  • Private and public sector fleets, local authorities and non-profits anywhere in the UK
  • Your fleet has, or will have, at least one battery-electric HGV, van or coach
  • You've operated in the UK for at least a year and own or lease the depot
  • You can show enough grid capacity, or a date your supply will be ready within the project window

What it can pay for

  • Chargers, installation, trenching, ducts, cabling and electrical works on your site
  • Battery storage and solar PV where they directly power the chargers. We check this against the current scheme guidance for each project
  • It does not pay for the trucks themselves (see the truck grant opposite) or for DNO grid connection and reinforcement

How we help with your application

  • Site survey and a check of your supply, so you can show grid capacity
  • A full design, drawings and fixed costs to put in your bid
  • Installation completed well inside the scheme's deadline

Current window (2027/28)

Applications open11 Nov 2026
Applications close26 Feb 2027, midday
Award decisions due28 May 2027
Works completed by31 Mar 2028

Plus: Zero Emission Truck Grant

4.25–12 tonnesup to £15,000
12–18 tonnesup to £37,000
18–26 tonnesup to £52,000
26 tonnes and overup to £81,000

Taken off the price by the dealer. Capped at 20% of the vehicle cost for 4.25–12 t trucks and up to 40% for heavier trucks. Electric vans get up to £5,000.

Scheme details checked 15 November 2026 and can change. Full rules on GOV.UK: Depot Charging Scheme and truck grants.

How we work

From first visit to first charge

  1. Site survey

    We look at your supply, switchgear, yard and roof, and how your fleet actually runs, then tell you what will work.

  2. Design

    Full LV design to BS 7671:2018+A4:2026 with cable calculations, single line diagrams and layout drawings.

  3. Connections

    G99 and G100 applications, and DNO connection offers through our ICP partners where a new supply is needed.

  4. Groundworks

    Radar survey, trenching, ducts, bases and reinstatement, managed under CDM with our own construction phase plan.

  5. Install and commission

    Chargers, batteries, solar and panels installed by our own team, then tested and commissioned with the manufacturers.

  6. Handover

    Electrical certificates, O&M manuals and as-built drawings, plus support after switch-on.

About Jones Electric

An electrical contractor first

Jones Electric (Doncaster) Ltd is an established electrical contractor and NICEIC Approved Contractor. Charging, batteries and solar are electrical installations first, and we bring years of commercial electrical experience to every one.

We've been installing EV charging for 11 years, from single 7 kW wallboxes to 1.2 MW charging hubs. Every job is carried out by our own directly employed team, not subcontractors, and we act as principal contractor and designer on larger schemes.

Chargers we've installed and commissioned include Alpitronic, Kempower, Tritium, Nidec, ABB, Siemens and Vestel.

We install charging equipment for many of the UK's charge point operators (CPOs), including:

  • Evyve
  • Zest
  • Mer
  • Be.EV
  • Zapgo
  • Connected Kerb
  • DC rapid charging hub, PerthshirePrincipal contractor and designer: DNO connection, groundworks, feeder pillar and high-power charger.
  • Fire and rescue stations, Greater ManchesterEV charging installed across operational fire stations, with civils, RAMS and construction phase plans for each site.
  • DC charger replacement programme, West YorkshireLike-for-like swaps of public DC chargers, including new concrete bases.
  • Retail park charging hubs, EnglandFeeder pillars, sub-mains, lighting and charger installation for national charge point operators.
Talk to us

Book a site survey

Tell us about your site and your fleet. We'll come and look at your supply and your yard, and tell you honestly what charging, battery storage and solar can do for you.

Phone07366 671821
WhatsApp07366 671821
Emailmartin@joneselectric.co.uk
Office
10 Platinum Park, First Avenue,
Doncaster DN9 3RH
WhatsApp us